The second layer of concrete was poured Friday afternoon, and it has now cured enough to walk on. Eventually, there will be "luxury vinyl tile" over the concrete, but not until the rest of the heavy work is done.
Next up is relocating some of the large white water pipes on the ceiling to make way for the new HVAC system. This means shutting down air conditioning for all of Robinson Hall until the pipes are reconnected. Sorry, everyone!